Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd.

Dellok YONGHUI TECH Co.,Ltd. Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd.

Manufacturer from China
Verified Supplier
5 Years
Home / Products / Studded Tube /

DELLOK Studded Tube Nailhead Tube For Heat Transfer Boiler

Contact Now
Dellok Yonghui Radiating Pipe Manufacturing Co.,Ltd.
Visit Website
City:nanjing
Province/State:jiangsu
Country/Region:china
Contact Person:MrBrian Wanqian
Contact Now

DELLOK Studded Tube Nailhead Tube For Heat Transfer Boiler

Ask Latest Price
Video Channel
Brand Name :Dellok Yonghui
Model Number :Studded Tube
Certification :ISO90001
Place of Origin :China
MOQ :1 piece
Price :$10 ≥1 Piece/Pieces
Payment Terms :MoneyGram, Western Union, T/T, D/P, D/A, L/C
Supply Ability :10000 Piece/Pieces per Month
Delivery Time :1-3 weeks
Packaging Details :wooden box
Application :Industrial
Color :Silver
Length :Customized
Material :Stainless Steel
Shape :Round
Size :Customized
Studded Angle :Customized
Studded Diameter :Customized
Studded Height :Customized
Studded Material :Carbon Steel
Studded Number :Customized
Studded Pitch :Customized
Studded Type :Cone Studs
Surface Treatment :Polishing
Thickness :Customized
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

DELLOK Studded Tube Nailhead Tube For Heat Transfer Boiler

About Us

Dellok(YONGHUI Radiating Pipe Manufacturing Co.,Ltd) was established in 2002, which is located in Nanjing, China.We joined HARBIN AIR CONDITIONING CO., LTD. in 2022 and became the most professional industry manufacturer in China. After many years of development, the company now has 66 million yuan in fixed assets, more than 200 employees, and 33 technical staffs. We have 4 aluminum processing production lines, with the annual processing capacity of more than 20,000 tons; And we have 5 tube-drawing production lines; 47 fintube production lines, 1 imported production line from American with the brand of McElroy , with the annual production capacity of 12 million meters the above.

Quality is the theme of eternal pursuit of winner.


Studded Tube Product Description:

Studded Tube are obtained by electric-resistance welding the studs on the external surface of the tube. Such stud welding acting on the entire cross-section of the studs make studded tubes the most robust extended-surfaces tubes which is an important characteristic to consider in particular if severe mechanical loads are expected during service or cleaning.

Studded tubes vary by pattern design, number of rows, space between rows, number of studs in a raw etc. Studs can be find in a large variety of sizes, shapes and materials.The are loaded into the automated electric-welding machine and press welded as the tube is moved longitudinally and circularly following the pattern required. To provide special patterns or for highly customized applications studs are set one by one using a manual electric-welding machine.

Heat exchange efficiency increases dramatically when using studded tubes or pies in comparison to bare surface pipes. Efficiency could increase of 2-3 times and more.

By using studded tubes/ studded pipes it is possible to reduce the amount of bare pipes required for the same heat transfer volume, thus resulting in a more economical solution and lighter weight.

DELLOK Studded Tube Nailhead Tube For Heat Transfer Boiler

Studded Tube(Stainless Steel Welded Tube) Manufacturing Process:

The steel studs are automatically resistance welded to the tube, producing high quality forge welds. The welding process enables the combination of any grades for studs and tube: carbon, low alloy, stainless steels and high nickel alloys.

DELLOK Studded Tube Nailhead Tube For Heat Transfer Boiler

Studded Tube(Welded Stainless Tube) Advantages:

To increase the surface area of the tube and to protect tube surface from direct exposure to heat /corrosive environment.

Studding reduces the amount of bare pipes used in these processes. Heat transfer surface of one studded pipe is equivalent to surface of 4 to 10 bare pipes.

Use of studded tubes is ideal for processes/applications, where dirty fuels are used in harsh environments.

DELLOK Studded Tube Nailhead Tube For Heat Transfer Boiler

Studded Tube(Black Welded Pipe) Properties:

Manufacturing Process:- Electric Resistance Welding

Fin To Tube Bond:- Excellent

Heat Transfer Efficiency:- Excellent

Mechanical Resistance:- Excellent (Hence can be frequently cleaned with high pressure jets unlike other fin tubes. Thereby reducing down time and increasing overall life)

Corrosion Protection:- Gives excellent corrosion protection to the base tube since it entirely covers the base tube (except bare ends).

Temperature Range:- Depending on Properties of material of Fin (Stud) and Pipe

DELLOK Studded Tube Nailhead Tube For Heat Transfer Boiler

Studded Tube(Weld Galvanized Pipe) Applications:

High density crude oil is passed through studded tubes which are heated from outside. Liquefied product comes out from the other end, which now can be used for further processing.

At times, navy boilers also require studded tubes, with oval shaped studs welded on them. These are used for heating water in water tube boilers.

DELLOK Studded Tube Nailhead Tube For Heat Transfer Boiler

Studded Tube(Fin Tube) Specifications:

Product Specification
Tube OD 25~273 (mm) 1”~10” (NPS)
Tube Wall Thk 3.5~28.6 (mm) 0.14”~1.1”
Tube Length ≤25,000 (mm) ≤82 ft
Stud Thk 6~25.4 (mm) 0.23”~1”
Stud Height 10~35 (mm) 0.4”~1.38”
Stud Pitch 8~30 (mm) 0.3”~1.2”
Stud Type Cylindrical, Elliptical, Lens type
Stud to tube surface angle Vertical or Angular
Material Combinations
Stud Material C.S. (most common grade: Q235B)
S.S. (most common grade are AISI 304, 316, 409, 410, 321,347)
A.S.
Tube Material C.S. (most common grade: A106 Gr.B)
S.S. (most common grade are TP304,316, 321, 347)
A.S. (most common grade are T/P5,9,11,22,91)
Type of Service High temperature

DELLOK Studded Tube Nailhead Tube For Heat Transfer Boiler

Product Categories : Studded Tube


FAQ

Q1: Are you trading company or manufacturer?

A: We are manufacture factory and we can accept OEM order. Welcome to visit our factory and check our products.

Q2: Can I have a sample ?

A: Yes, welcome to place sample order to test and check quality. Mixed samples are also OK.

Q3: What is your the lead time for production?

A: Generally Sample needs 1-3 days, mass production needs 15-30 days, also depends on your request.

Inquiry Cart 0